AUTOMOTIVE PLANT CLEARANCE
A high-stakes factory strip-out project for a leading automotive manufacturer, clearing the way for a new EV production line.
The Challenge
The client needed to clear a 50,000 sq ft production hall containing heavy robotic arms, conveyor systems, and hydraulic presses. The facility was adjacent to an active production line, meaning noise, dust, and vibration had to be strictly controlled.
Our Solution
OPUS Group implemented a "surgical" dismantling strategy. We used specialized electric cutting equipment to eliminate fumes and noise. Our approach involved:
- Installation of dust suppression curtains and air monitoring.
- Crane-assisted removal of 20-ton press units.
- Segregation of ferrous and non-ferrous metals on-site.
- Direct resale of 15 functioning robotic units to overseas buyers.
The Outcome
The hall was handed back to the client in "broom-clean" condition 2 weeks ahead of the deadline. The resale of the robotic units generated a significant revenue stream for the client, offsetting 60% of the project costs.
Project Key Facts
- Client Global Auto Maker
- Area 50,000 sq ft
- Cost Offset 60%
- Safety Incidents Zero
The speed and cleanliness of the operation were impressive. OPUS Group allowed us to accelerate our EV transition plans.